Rte. 47 Widening Project in Troy

The Route 47 widening project in TroyProject Completed

Part of the project included widening the Rte. 47/Lincoln Drive intersection and adding signals.  In addition to the widening, MoDOT incorporated signals at Rtes. H and J into the same contract.

A cooperative partnership with the former Transportation Development District in Troy and MoDOT, the projects cost was $1,636,625.85 with half funded from $900,000 collected when the TDD existed.  The project was awarded to N. B. West Contracting Company of Brentwood, MO. The signal installation at Routes H and J cost $176,432.72 and was financed with MoDOT District 3 safety funds. 

Engineering Design Plans (Main St. to Wal-mart)

Engineering Design Plans (Wal-mart to West Side of Front St.)

Engineering Design Plans (East of Front St. to McDonald's)

Engineering Design Plans (McDonald's to Rte. 61 ramps)

Aerial View (entire project)

Rtes. H & J Traffic Signals Display

If you have questions about the project, please call Chris Knapp, project manager, at 573-248-2586 or email him directly.

 



   
   