2011 Highway Construction Projects in NE Missouri

The following projects have been planned for the summer of 2011:

-Approximately $10 million in minor road improvements

-More than 430 miles of new surface and pavement improvements

-Rehabilitating or replacing 41 bridges on minor roads

 

Spring/Summer/Fall 2011

Audrain County

Active/Current Road Work in Audrain County

Route E – Resurfacing from Route 15 south to Route 22, approximately 8.6 miles; bids to open Summer 2011.

Route JJ - Resurfacing from Route 54 south to the end of state maintenance; bids to open October 2011.

Route B - Resurfacing from Route J west junction south through Rush Hill to Route 54 just east of Mexico; bids to open October 2011.

Route KK - Resurfacing from Route B north junction to Route 19/54 at Laddonia; bids to open October 2011.

Safe and Sound Bridge Improvements in Audrain County

The following bridge is scheduled to be closed for rehabilitation only. The closure schedule will be determined by the contractor for the project.

Route E – Safe & Sound Bridge Rehabilitation to redeck Young’s Creek Bridge located north of Thompson; August 2011 (will be closed approx. 60 days) - Contractor - Emery Sapp & Sons Inc.

The following bridges are scheduled to be closed for complete removal and replacement on the following dates in a single Design/Build contract with KTU Constructors. This closure schedule is subject to change.

Route 15 at Long Branch - CLOSED thru July 15, 2011 (53 days)

Route 54 at Cuivre River Bridge located 3.5 miles south of Laddonia - CLOSED thru July 14, 2011 (38 days)

Route D at Scattering Fork Bridge - closing July 18-September 1, 2011 (53 days)

Route FF at Davis Creek Bridge - closing August 29-October 19, 2011 (51 days)
Route Y at Reese Fork Bridge located ½ mile south of Monroe County Line - closing September 6-October 20, 2011 (44 days)

Route B at Branch of Lick Creek Bridge - closing October 27-November 30, 2011 (34 days)


Clark County

Active/Current Road Work in Clark County

Safe and Sound Bridge Improvements in Clark County

The following bridges are scheduled to be closed for complete removal and replacement on the following dates in a single Design/Build contract with KTU Constructors. This closure schedule is subject to change.

Route K at Little Fox River Bridge located north of Luray 2 miles north of Route N - closing July 18-September 9, 2011 (53 days)

Co. Rd. 306 Bridge located 4 miles east of US61/27 junction - closing October 3-November 3, 2011 (36 days)
Route AA at Little Fox River Bridge located north of Luray 1.5 miles south of Route NN - closing October 17-December 9, 2011 (43 days)


Knox County

Active/Current Road Work in Knox County

Route 11 – Resurfacing from Route 15 to the Adair County line, approximately 7.7 miles; Contractor - Chester Bross Const. Co. for $379,254.21
Route CCompleted - Painting on North Fork of South Fabius River Bridge. Contractor-Thomas Industrial Coatings, Inc. This painting contract is part of the Safe and Sound Bridge Program.

Safe and Sound Bridge Improvements in Knox County

The following bridges are scheduled to be closed for complete removal and replacement on the following dates in a single Design/Build contract with KTU Constructors. This closure schedule is subject to change.

Route J at S. Fork Fabius River Bridge located north of Hurdland 3 miles south of Route 11 - COMPLETED MAY 2011

Route 156 at South Fabius River Bridge located 1 mile west of Newark - CLOSED thru July 9, 2011 (53 days)

Route E at Troublesome Creek Bridge located south of Knox City 3.5 miles south of Route 6 - CLOSED thru August 3, 2011 (44 days)


Lewis County

Active/Current Road Work in Lewis County

Route VCompleted - Resurfacing from Route 61 in Marion County to Route 16; Contractor-Bross Construction Co. for $270,706.59.

Route 61 - Preventative maintenance on bridge over Wyaconda River and Business Route 61/Route B overpass near LaGrange; Contractor - PCI Roads, LLC
Route E – Surface preparation and bridge painting on Wyaconda River Bridge. Contractor-Thomas Industrial Coatings, Inc. This painting contract is part of the Safe and Sound Bridge Program.

Safe and Sound Bridge Improvements in Lewis County

The following bridge is scheduled to be closed for complete removal and replacement on the following date in a single Design/Build contract with KTU Constructors. This closure schedule is subject to change.
Route 156 at Big Grassy Creek Bridge located west of Ewing - closing July 25-September 7, 2011 (44 days)


Lincoln County

Active/Current Road Work in Lincoln County

Route V – Resurfacing from Route 61 to Route W, 6 miles-Contractor-Pace Construction Co., LLC for $231,999.87
Route 79Completed - Resurfacing from Route 47 to north of Route C near Old Monroe, 4.9 miles-Contractor-Pace Construction Co., LLC for $191,151.27
Route WW – Resurfacing from north of Wright City at Route J to the end of State Maintenance, 2.5 miles-Contractor-Pace Construction Co., LLC for $111,173.92
Route C  - Completed - Resurfacing from east of Route 61 to east of Route 79, 10.1 miles-Contractor-Pace Construction Co., LLC for $385,339.85
Route MM  - Resurfacing from Route C to end of State Maintenance, 4.1 miles-Contractor-Pace Construction Co., LLC for $166,930.45
Route D  - Resurfacing from Route O to Route 47 in Hawk Point, 7.7 miles-Contractor-Pace Construction Co., LLC for $326,768.61
Route A  - Resurfacing from Route DD in Truxton to Route 47 in Hawk Point, 6.6 miles-Contractor-Pace Construction Co., LLC for $273,570.61
Route DD – Resurfacing from Route E in Montgomery County to Route A in Truxton, 7.2 miles-Contractor-Pace Construction Co., LLC for $302,177.35
Route 47 – IN PROGRESS - Resurfacing from east of Route 61 to Main Street in Troy, 1.7 miles-Contractor-Mid Rivers Asphalt, Inc. for $773,404.39
Route KK Overpass - Preventative maintenance on bridge over Route 61 at Route KK north of Troy. Contractor-PCI Roads, LLC.

Old Cap Aus Gris Rd. Overpass – Preventative maintenance on bridge over Route 61 at Old Cap Aus Gris Rd. at Troy. Contractor-PCI Roads, LLC.

Route 47  - Signals/turn lanes at Fairgrounds & Ellis in Troy; bids to open June 24, 2011
Route 61 – Bridge painting at Old CapAuGris overpass near Troy-Contractor-Thomas Industrial Coatings, Inc. for $54,470
Route DD – Surface preparation and bridge painting on Bear Creek Bridge. COMPLETED MAY 2011 - Contractor-Thomas Industrial Coatings, Inc. This painting contract is part of the Safe and Sound Bridge Program.

Route 61 – Resurfacing north and southbound lanes in Pike and Lincoln Counties; bids to open December 2011
Route 61 – Resurfacing northbound lanes from north of Route Z to south of the K and V intersection; bids to open December 2011

Safe and Sound Bridge Improvements in Lincoln County

The following bridge is scheduled to be closed for rehabilitation only. The closure schedule will be determined by the contractor for the project.

Route W – Safe & Sound Bridge Rehabilitation - Redeck Bryant’s Creek Bridge located 3 miles north of Route B - CLOSED THRU July 30, 2011 (88 days)-Contractor-Lehman Construction for $233,693


The following bridges are scheduled to be closed for complete removal and replacement on the following date in a single Design/Build contract with KTU Constructors. This closure schedule is subject to change.

Route KK at Sugar Creek Bridge located north of Troy/west of Foley- closing July 25-September 14, 2011 (51 days)

Route 147 at Big Sugar Creek Bridge located east of Troy at the north edge of Cuivre River Park - closing September 19-November 7, 2011 (49 days)

Route V at Sugar Creek Bridge located north of Troy - closing September 19-October 28, 2011 (39 days)


Marion County

Active/Current Road Work in Marion County

Route 36 - Completed - Pavement treatment (diamond grind) and rehabilitate shoulders on eastbound lanes from just west of Business Route 36 west junction to Old Highway 36 at Monroe City, 5.4 miles-Contractor-Chester Bross Const. Co., Hannibal, MO for $403,262.30

Route 168Completed - Resurfacing from Business Route 61 in Palmyra to Route 15 in Shelby County, 31.3 miles-Contractor-Chester Bross Const. Co., Hannibal, MO for $1,395,195.68
Route VCompleted - Resurfacing from Route 61 to Route 16 in Lewis County-Contractor-Chester Bross Const. Co., Hannibal, MO for $270,706.59
Route 168 – Bridge Rehabilitation at South River Bridge located west of Palmyra; project is inactive pending notification by contractor on start date. Contractor-PCI Roads, LLC.
Route 24/61 - Preventative maintenance on southbound North River Bridge on 24WB/61SB just north of Palmyra. Contractor-PCI Roads, LLC.

Route Z - Preventative maintenance involving hydrodemolition and overlay on North Fork North River Bridge south of Philadelphia. Contractor-PCI Road, LLC.

Route 61 – Intersection improvements at West Ely/Pleasant St. with the City of Hannibal; bids to open July 24, 2011
Route 24/61 – Intersection improvements through Palmyra; bids to open July 24, 2011

Safe and Sound Bridge Improvements in Marion County

The following bridge is scheduled to be closed for rehabilitation only. The closure schedule will be determined by the contractor for the project.

Route CC – Safe & Sound Bridge Rehabilitation at South Fork North River at Sharpsburg Branch Bridge located 2 miles east of Route K-Closure date to be determined in spring/summer 2011 (44 days); Contractor-APAC-Missouri, Inc.


Monroe County

Active/Current Road Work in Monroe County

Route 24Completed - Pavement rehabilitation (diamond grind) from east of Paris east of Route HH (2 disconnected sections), approximately 5.9 miles; Contractor-Chester Bross Const. Co., Hannibal, MO for $627,812.81

Route 24 - Pavement rehabilitation from Randolph County line to west of Route 154 just east of Paris; bids to open October 2011, Construction in 2012

Routes 107 and FF – Preventative maintenance Mark Twain Lake bridges in Monroe/Ralls Counties; bids to open May 2011
Route C – Surface preparation and bridge painting on Elk Fork Salt River Bridge. Contractor-Thomas Industrial Coatings, Inc. This painting contract is part of the Safe and Sound Bridge Program.

Safe and Sound Bridge Improvements in Monroe County

The following bridges are scheduled to be closed for rehabilitation only. The closure schedule will be determined by the contractor for the project.

Route A – Safe & Sound Bridge Rehabilitation at Middle Fork Salt River Bridge located 2 miles north of Holliday-CLOSED thru July 21, 2011 (60 days); Contractor - Emery Sapp & Sons Inc.

Route D – Safe & Sound Bridge Rehabilitation at Long Branch Creek Bridge-Closure date to be determined in August 2011 (60 days); Contractor - Emery Sapp & Sons Inc.

The following bridge is scheduled to be closed for complete removal and replacement on the following dates in a single Design/Build contract with KTU Constructors. This closure schedule is subject to change.

Route 151 at Reese Fork of Salt River Bridge located near Leonard at Route M junction - closing July 13-September 4, 2011 (53 days)


Montgomery County

Active/Current Road Work in Montgomery County

Route 19 – Resurfacing from 1.7 miles south of I-70 to 0.5 mile south of Route 94 near McKittrick, 12.8 miles-Contractor-Magruder Paving LLC for $641,043.32

Route CC – IN PROGRESS - Bridge deck rehabilitation at Elkhorn Creek located 1 mile east of Gamma-Contractor-Lehman Construction, LLC for $419,346.28

Route E – Resurfacing from Route DD to Route V in Bellflower, 2.5 mile-Contractor-Pace Construction Co., LLC for $108,713.60

Route V – Resurfacing from Route 161 to Route E near Bellflower, 4.6 miles-Contractor-Pace Construction Co., LLC for $192,196.72

Route 94 – Resurfacing from Route P to 0.1 mile west of Route 19 near McKittrick, 4.7 mile-Contractor-Magruder Paving LLC for $193,607.19

Route 161 – Resurfacing from Route 19 South junction in Montgomery City to Interstate 70, 5.9 miles-Contractor-Pace Construction Co., LLC for $251,998.46

Interstate 70 North Outer Road – Resurfacing from Route F at High Hill to Route A in Warren County, 9.2 miles-Contractor-Magruder Paving LLC for $413,420.56

Route WW – Resurfacing from Route 19 to I-70 NOR (Midpoint) 2.3 miles-Contractor-Magruder Paving LLC for $117,920.61

Route AC – Project work includes surface preparation and bridge painting on the Cuivre River Bridge. Contractor-Thomas Industrial Coatings, Inc. This painting contract is part of the Safe and Sound Bridge Program.
Route F – Surface preparation and bridge painting on Bear Creek Bridge. Contractor-Thomas Industrial Coatings, Inc. This painting contract is part of the Safe and Sound Bridge Program.

Route Y – Resurfacing from Route 19 south of Big Sprin to Route E at Jonesburg-Bids to open October 2011

Safe and Sound Bridge Improvements in Montgomery County

The following bridge is scheduled to be closed for complete removal and replacement on the following dates in a single Design/Build contract with KTU Constructors. This closure schedule is subject to change.

Route AA at Coon Creek Bridge located 2.5 miles north of Wellsville - COMPLETED May 2011


Pike County

Active/Current Road Work in Pike County

Route 79 CLOSED AT ASHBURN –5% complete – Project involves grading and relocating two lane road from Route TT to north of the Salt River near Ashburn. Work due to unstable road conditions from slide; Contractor- Kolb Grading, LLC.
Route UU – Resurfacing from Route 61 north of Bowling Green to Route 54 west of Louisiana; bids to open October 2011

Route 154 – Resurfacing from Route 19 south junction to Route 54 between Vandalia and Curryville; bids to open October 2011

Route 61 – Resurfacing north and southbound lanes in Pike and Lincoln Counties; bids to open December 2011

 

Safe and Sound Bridge Improvements in Pike County

The following bridge is scheduled to be closed for rehabilitation only. The closure schedule will be determined by the contractor for the project.

Route WW – Safe & Sound Bridge Rehabilitation at Mud Creek Bridge north of Paynesville or just east of Clopton School - CLOSED thru August 12, 2011 (70 days)-Contractor-Lehman Construction for $229,770

The following bridges are scheduled to be closed for complete removal and replacement on the following dates in a single Design/Build contract with KTU Constructors. This closure schedule is subject to change.

Route 79 at Small Creek Bridge located 3.5 miles south of Clarksville - COMPLETED April 8, 2011

Route H at Little Ramsey Creek Bridge located 1.5 miles west of Paynesville - COMPLETED June 2011

Route M at S. Branch Indian Creek Bridge located so. of Curryville 1 mile south of Route V - CLOSED thru July 7, 2011 (45 days)

Route W at Guins Creek Bridge located 2 miles south of Paynesville - CLOSED thru July 23, 2011 (53 days)

Route AC at Sandy Creek Bridge located 3.5 miles south of Gazette - closing July 5-August 18, 2011 (44 days)

Route V at Indian Creek Bridge- closing August 8-September 21, 2011 (44 days)


Ralls County

Active/Current Road Work in Ralls County

Route 79Completed - Slide correction location 3.1 miles south of Route N intersection near Saverton, 0.057 mile-Contractor-Boone Construction Co. for $189,293.00
Route PCompleted - Surface preparation and bridge painting on the Spencer Creek Bridge just north of the Audrain County line. Traffic will be reduced to one lane while crews are working. Contractor-Thomas Industrial Coatings, Inc. Work estimated at 5 working days, weather permitting. This painting contract is part of the Safe and Sound Bridge Program.

Route 154 – Resurfacing from Route 19 south junction to Route 54 between Vandalia and Curryville; bids to open October 2011

Safe and Sound Bridge Improvements in Ralls County

The following bridge is scheduled to be closed for rehabilitation only. The closure schedule will be determined by the contractor for the project.

Route J – Safe & Sound Bridge Rehabilitation at Ely Creek Bridge - COMPLETED MAY 2011 - Contractor-Lehman Construction for $140,958

Route E – Safe & Sound Bridge Rehabilitation at Malaruni Creek Bridge near Saverton - Closure date to be determined in late August 2011 (64 days)-Contractor-Lehman Construction for $343,128

The following bridges are scheduled to be closed for complete removal and replacement on the following dates in a single Design/Build contract with KTU Constructors. This closure schedule is subject to change.

Route P at Spencer Creek Bridge located between Routes K and JJ junctions - COMPLETED April 21, 2011

Route 154 at Spencer Creek Bridge located 1.5 miles east of Route P - COMPLETED April 20, 2011

Route 19 at East Lick Creek Bridge located 1 miles northof the Audrain County line - COMPLETED June 2011

Route F at Spencer Creek Bridge located 2 miles north of Routes C and F junction- closing September 26-November 15, 2011 (50 days)


Scotland County

Active/Current Road Work in Scotland County

Route DCompleted - Bridge painting at North Fork Middle Fabius River west of Route 15-Contractor-Tarpon Industrial, Inc. for $111,810. Painting contract part of Safe and Sound Bridge Program.

Safe and Sound Bridge Improvements in Scotland County

The following bridge is scheduled to be closed for rehabilitation only. The closure schedule will be determined by the contractor for the project.

Business Route 136 – Safe & Sound Bridge Rehabilitation at Abandoned Railroad Bridge in Memphis-CLOSED thru July 2, 2011 (30 days); Contractor-Phillips Grading and Construction Inc.

The following bridge is scheduled to be closed for complete removal and replacement on the following dates in a single Design/Build contract with KTU Constructors. This closure schedule is subject to change.

Route Z at Little Fox River Bridge located ½ mile south of Iowa State line - closing September 6-October 29, 2011 (53 days)


Shelby County

Active/Current Road Work in Shelby County

Route 36 Shelby/Marion – IN PROGRESS - Project involves rehabilitating pavement on eastbound lanes from just east of the Macon County line to just west of Business 36 west junction at Monroe City (4 disconnected sections)*, approximately 20.127 miles. IN PROGRESS THRU SUMMER 2011

Route 168Completed - Resurfacing from Route 15 in Shelby County to Business Route 61 in Palmyra, 31.3 miles-Contractor-Chester Bross Const. Co., Hannibal, MO for $1,395,195.68

Safe and Sound Bridge Improvements in Shelby County

The following bridge is scheduled to be closed for rehabilitation only. The closure schedule will be determined by the contractor for the project.

Route T - Safe & Sound Bridge Rehabilitation at Salt River Bridge north of Shelbina-Closure date to be determined in June 2011 (44 days); Contractor - APAC-Missouri, Inc.


Warren County

Active/Current Road Work in Warren County

Interstate 70 - Resurfacing westbound lanes from St. Charles County line west to 1 mile east of Route F in Montgomery County (2 disconnected sections), 15.3 miles; Contractor-Magruder Paving LLC, Troy, MO for $3,396,864.31

Interstate 70 South Outer Road – Resurface from Route B to the end of State maintenance in Warrenton, 4.4 miles-Contractor-Magruder Paving LLC for $201,753.31

Route 94 Completed - Bridge painting at Charrette Creek Bridge near Marthasville-Contractor-Thomas Industrial Coatings, Inc. for $87,000

Interstate 70 - Resurface eastbound lanes from Warrenton to St. Charles County line; bids to open October 2011

Route AA - Resurface from Route 47 to end of state maintenance; bids to open October 2011

Route MM - Resurface from Old 40 to Route M at Warrenton; bids to open October 2011

Route 47 – IN PROGRESS - Bridge replacement located 1.3 miles south of Route 94 north junction at Tuque Creek; project includes realignment of Route D over One St. in Marthasville. Bridge closed April 11 thru summer (high water suspended operations). Contractor-Chester Bross Const. Co.

Safe and Sound Bridge 2012 Improvements in Warren County

 