What is happening on I-35?
MoDOT is conducting an operational study to develop potential improvements for approximately two miles of I-35 in the Kansas City metropolitan area. The study is intended to:
- Determine the current and future needs of the I-35 corridor
- Develop improvement concepts for addressing those needs
- Recommend a preferred range of solutions to meet identified needs in the I-35 corridor
On June 18, MoDOT officials held a series of workshops with local citizens about the needs in the corridor. Review the notes from those workshops here.
A follow-up meeting was held Dec. 9, 2010, to review the major themes and concerns from our public outreach effort and discuss the draft range of solutions. Review the notes from that meeting here.
Click through the following pages to learn more about the draft range of solutions -- covering low to high cost -- and share your comments on each.
|