I-70 Major Investment Study
Conceptual Strategies -
Package 2-C
|
Package
2-C
New Alignment and Unique Features
Bus Rapid Transit |
| . |
|
New I-70 Alignment
(Tunnel), from Loop North Leg to the Upgraded 22nd /23rd Street
Interchange at Benton Curve |
| . |
|
Add I-70 Community Bridges |
| . |
|
Integrate Smart Moves Bus Plan
- Phase 3 |
| . |
|
Add Bus Rapid Transit on Parallel
Arterial Routes |
| . |
|
Support Commuter Rail |
| PLUS Package 2-B |
| . |
|
Add High Occupancy Vehicle (HOV)
/ Reversible Flow Express Lanes |
| . |
|
Upgrade Major Interchanges along
I-70 |
| . |
|
Straighten Benton and Jackson
Curves |
| . |
|
Consider Toll Options (i.e. HOT
Lanes) |
| . |
|
Integrate Smart Moves Bus Plan
- Phase 2 |
| . |
|
Support Transit Centers
|
| PLUS Package 2-A |
| . |
|
Rebuild I-70 as Six Lanes from
Downtown Central Business District (Loop) to State Route M-7
|
| . |
|
Widen I-70 to Six Lanes East of
M-7 to Oak Grove (from I-70 Statewide FTED) |
| . |
|
Consolidate Loop Access on North
and East Legs |
| . |
|
Upgrade I-70 Interchanges at Oak
Grove and Grain Valley |
| . |
|
Build Low-Cost I-70
and Loop Operational Improvements |
| . |
|
Build Low-Cost Interchange Improvements
along I-70 |
| . |
|
Upgrade Truman Road and 22nd/23rd
Street Corridors |
| . |
|
Integrate Smart Moves Bus Plan
- Phase 1 (Increase Commuter Express Bus Service) |
| . |
|
Advance Operation Green Light
/ Integrate Advance Public Transportation Systems (Parallel
Arterial Management Systems) |
| . |
|
Expand Freeway Service Patrols
|
| PLUS Package 1 |
| . |
|
Upgrade I-435 Interchange (from I-435 MIS)
|
| . |
|
Upgrade Loop's N.E. Corner / Paseo and Add
New Transit Fixed Guideway Bridge over Missouri River (from
Northland-Downtown MIS) |
| . |
|
Repave I-70 and Build Low-Cost Repairs |
| . |
|
Upgrade I-70 Interchanges (as identified on
MoDOT Bridge List) |
| . |
|
Maintain Existing Bus Service |
| |
|
|
| |
|
Package