News and Information News and Information Facebook, Twitter, Blog, YouTube, Podcast, Widgets
Our mission is to provide a world-class transportation experience that delights our customers and promotes a prosperous Missouri.

Contact Us
Career Opportunities
Project Bid Opening Info
Missouri Highways and Transportation Commission
Map Request
MoDOT Express Lane
Motor Carrier Services
MoDOT
Central Office
105 W. Capitol Avenue
Jefferson City, MO 65102
1-888 ASK MODOT
(1-888 275 6636)

I-70 Major Investment Study

Conceptual Strategies - Package 2-C

Package 2-C
New Alignment and Unique Features
Bus Rapid Transit


.   New I-70 Alignment (Tunnel), from Loop North Leg to the Upgraded 22nd /23rd Street Interchange at Benton Curve
.   Add I-70 Community Bridges
.   Integrate Smart Moves Bus Plan - Phase 3
.   Add Bus Rapid Transit on Parallel Arterial Routes
.   Support Commuter Rail

PLUS Package 2-B
.   Add High Occupancy Vehicle (HOV) / Reversible Flow Express Lanes
.   Upgrade Major Interchanges along I-70
.   Straighten Benton and Jackson Curves
.   Consider Toll Options (i.e. HOT Lanes)
.   Integrate Smart Moves Bus Plan - Phase 2
.   Support Transit Centers

PLUS Package 2-A
.   Rebuild I-70 as Six Lanes from Downtown Central Business District (Loop) to State Route M-7
.   Widen I-70 to Six Lanes East of M-7 to Oak Grove (from I-70 Statewide FTED)
.   Consolidate Loop Access on North and East Legs
.   Upgrade I-70 Interchanges at Oak Grove and Grain Valley
.   Build Low-Cost I-70 and Loop Operational Improvements
.   Build Low-Cost Interchange Improvements along I-70
.   Upgrade Truman Road and 22nd/23rd Street Corridors
.   Integrate Smart Moves Bus Plan - Phase 1 (Increase Commuter Express Bus Service)
.   Advance Operation Green Light / Integrate Advance Public Transportation Systems (Parallel Arterial Management Systems)
.   Expand Freeway Service Patrols

PLUS Package 1
.   Upgrade I-435 Interchange (from I-435 MIS)
.   Upgrade Loop's N.E. Corner / Paseo and Add New Transit Fixed Guideway Bridge over Missouri River (from Northland-Downtown MIS)
.   Repave I-70 and Build Low-Cost Repairs
.   Upgrade I-70 Interchanges (as identified on MoDOT Bridge List)
.   Maintain Existing Bus Service
     
    Package 2-C PDF map (547k)

The documents are provided in Acrobat Reader format. Free Acrobat Reader download PDF Icon

 


   
   
   
   
FlickrFlikcr WidgetsPodcastYouTubeBlogTwitter Widgets Podcast Facebook Twitter Blog YouTube Facebook