I-70 Major Investment
Study
Conceptual Strategies
- Packages 1 & 2-A
Package 1
Base Condition (No Build)
Maintain Existing Bus Service |
| . |
|
Upgrade I-435 Interchange
(from I-435 MIS) |
| . |
|
Upgrade Loop's N.E. Corner / Paseo
and Add New Transit Fixed Guideway Bridge over Missouri River
(from Northland-Downtown MIS) |
| . |
|
Repave I-70 and Build Low-Cost
Repairs |
| . |
|
Upgrade I-70 Interchanges (as
identified on MoDOT Bridge List) |
| . |
|
Maintain Existing Bus Service
|
| Package
1 PDF map (167k) |
| |
Package 2-A
Rebuild I-70 as Six Lanes
Increase Commuter Express Service |
| . |
|
Rebuild I-70 as Six Lanes
from Downtown Central Business District (Loop) to State
Route M-7 |
| . |
|
Widen I-70 to Six Lanes
East of M-7 to Oak Grove (from I-70 Statewide FTED)
|
| . |
|
Consolidate Loop Access
on North and East Legs |
| . |
|
Upgrade I-70 Interchanges
at Oak Grove and Grain Valley |
| . |
|
Build Low-Cost I-70 and
Loop Operational Improvements |
| . |
|
Build Low-Cost
Interchange Improvements along I-70 |
| . |
|
Upgrade Truman Road and
22nd/23rd Street Corridors |
| . |
|
Integrate Smart Moves Bus
Plan - Phase 1 (Increase Commuter Express Bus Service)
|
| . |
|
Advance Operation Green
Light / Integrate Advance Public Transportation Systems
(Parallel Arterial Management Systems) |
| . |
|
Expand Freeway Service Patrols
|
| PLUS Package 1 |
| . |
|
Upgrade I-435 Interchange (from I-435
MIS) |
| . |
|
Upgrade Loop's N.E. Corner / Paseo and
Add New Transit Fixed Guideway Bridge over Missouri
River (from Northland-Downtown MIS) |
| . |
|
Repave I-70 and Build Low-Cost Repairs
|
| . |
|
Upgrade I-70 Interchanges (as identified
on MoDOT Bridge List) |
| . |
|
Maintain Existing Bus Service
|
|
The documents are provided in Acrobat Reader format. Free Acrobat Reader download 