| Title |
Closing Date |
Closing Time
(DST) |
Tabulations |
| D211-022-R2 3-Inch and Type 5 Base Rock RFQ |
October 15, 2010 |
1:00 PM |
3-Inch and Type 5 Base Rock Tabulation Sheet |
| D211-020-R2 Crane and Pile Hammer Work RFQ |
October 5, 2010 |
1:00 PM |
Crane and Pile Hammer Work Tabulation Sheet |
| D211-019-R2 Type 2 Rock Blanket RFQ |
October 4, 2010 |
2:00 PM |
Type 2 Rock Blanket Tabulation Sheet |
| D211-018-R2 Spec 8 Aggregate RFQ |
October 4, 2010 |
1:00 PM |
Spec 8 Aggregate Tabulation Sheet |
| D211-007-RN Diesel Fuel Tank Cleaning RFB and Addendum 001 |
September 27, 2010 |
1:00 PM |
RFB NOT AWARDED
DUE TO BUDGET CONSTRAINTS |
| D211-017-RN PVC Caps for Pipe Bollards RFQ |
September 22, 2010 |
1:00 PM |
PVC Caps for Pipe Bollards Tabulation Sheet |
| D211-016-RO Used Oil Disposal RFB |
September 16, 2010 |
1:00 PM |
Used Oil Disposal Tabulation Letter |
| D211-015-R2 Chicago Pneumatic Jackhammers RFQ |
September 9, 2010 |
1:00 PM |
Chicago Pneumatic Jackhammers Tabulation Sheet |
| D211-014-RN Steel Pipe for Bollards RFB and Addendum 001 |
September 8, 2010
September 9, 2010 |
1:00 PM |
Steel Pipe for Bollards RFB Tabulation Sheet |
| D211-013-R2 Various Aggregates RFQ |
August 30, 2010 |
1:00 PM |
Various Aggregates Tabulation Sheet |
| D211-009-RN Stump Grinding Services RFQ |
August 19, 2010 |
1:00 PM |
Stump Grinding Service RFQ Tabulation Sheet |
| D211-011-R2 Emergency Premix RFQ |
August 19, 2010 |
10:00 AM |
Emergency Premix Tabulation Sheet |
| D211-010-RN Emergency Lease - Vibratory Rollers RFQ |
August 18, 2010 |
10:00 AM |
Emergency Lease - Vibratory Rollers RFQ Tabulation Sheet |
| D211-002-RN Collection & Disposal of Scrap Metal RFB and Addendum 001 |
August 6, 2010
August 12, 2010 |
1:00 PM |
RFB NOT AWARDED |
D211-008-R2 Sand RFQ |
August 4, 2010 |
9:00 AM |
Sand Tabulation Sheet |
| D211-006-R2 Two-Inch Rock (Wetlands Road) RFQ |
August 3, 2010 |
1:00 PM |
Two-Inch Rock (Wetlands Road) Tabulation Sheet |
| D211-003-R2 9-Foot Diameter Metal Pipe RFB and Addendum 001 |
August 2, 2010
August 3, 2010 |
1:00 PM |
9-Foot Diameter Metal Pipe Tabulation Sheet |
D211-005-R2 Rock Blanket and Gabion Stone RFQ |
July 27, 2010 |
1:00 PM |
Rock Blanket and Gabion Stone Tabulation Sheet |
| D211-001-RO Flexible Delineators RFQ |
July 20, 2010 |
1:00 PM |
Flexible Delineators Tabulation Sheet |
| D210-075-R2 Hydrodemolition - Bridge A1970 RFB |
June 24, 2010 |
1:00 PM |
Hydrodemolition Tabulation Sheet |
| D210-073-R2 Type 2 Rock Blanket RFB |
June 23, 2010 |
1:00 PM |
Type 2 Rock Blanket Tabulation Sheet |
| D210-072-R2 Aggregates - Rip-Rap RFB |
June 22, 2010 |
1:00 PM |
Aggregates - Rip-Rap Tabulation Sheet |
| D210-074-R2 Plate Steel RFQ |
June 15, 2010 |
1:00 PM |
Plate Steel Tabulation Sheet |
| D210-068-RN Tree Removal Services |
June 8, 2010 |
1:00 PM |
Tree Removal Service Tabulation Sheet |
| D210-071-R2 Trackhoe Rental RFQ |
June 2, 2010 |
1:00 PM |
Trackhoe Rental Tabulation Sheet |
| D210-069-R2 Trailer RFQ |
May 28, 2010 |
1:00 PM |
Trailer Tabulation Sheet |
| D210-066-RO Annual Propane RFB |
May 27, 2010 |
1:00 PM |
Annual Propane Tabulation Sheet |
| D210-067-R2 Diamond Grinding RFQ and Addendum 001 |
May 18, 2010 |
1:00 PM |
Diamond Grinding Tabulation Sheet |
| D210-065-R2 Rock Blanket and Rip-Rap RFQ |
April 27, 2010 |
1:00 PM |
Rock Blanket and Rip-Rap Tabulation Sheet |
| D210-062-R2 Hauling Cinders RFB |
April 22, 2010 |
1:00 PM |
Hauling Cinders Tabulation Sheet |
| D210-061-R2 Grade E Concrete Rock and Concrete Sand RFQ |
April 13, 2010 |
1:00 PM |
Grade E Concrete Rock and Concrete Sand Tabulation Sheet |
| D210-060-R2 Coal Slag Abrasive RFQ |
April 9, 2010 |
1:00 PM |
RFQ NOT AWARDED
DUE TO BUDGET CONSTRAINTS |
| D210-049-RO Annual Hot Mix RFB |
March 25, 2010 |
1:00 PM |
Annual Hot Mix Tabulation Sheet |
D210-048-R2 Lubricant Storage and Dispensing Apparatus RFQ and Addendum 001
|
March 18, 2010 |
1:00 PM |
Lubricant Storage and Dispensing Apparatus Tabulation Sheet |
| D210-058-R2 Hydraulic Breaker Rental RFQ |
March 17, 2010 |
1:00 PM |
Hydraulic Breaker Rental Tabulation Sheet |
| D209-062-R2-A Contract Mowing (Additional Areas) RFQ |
March 16, 2010 |
1:00 PM |
RFQ CANCELLED
DUE TO BUDGET CUTBACKS |
D210-053-RO Vehicle Maintenance RFB and Sample list of vehicles |
March 9, 2010 |
1:00 PM |
Vehicle Maintenance Tabulation Sheet |
| D210-057-R2 Solar Flashing Beacons RFQ |
March 4, 2010 |
1:00 PM |
Solar Flashing Beacons Tabulation Sheet |
| D210-054-RO Annual Concrete RFB |
February 25, 2010 |
1:00 PM |
Annual Concrete Tabulation Sheet |
| D210-056-R2 Trailers RFQ |
February 22, 2010 |
1:00 PM |
Trailers Tabulation Sheet |
| D210-055-R2 Timber For Bridge Backwall RFQ |
February 18, 2010 |
1:00 PM |
Timber for Bridge Backwall Tabulation Sheet |
| D210-052-RN 9' Pickup Material Spreaders RFQ |
February 10, 2010 |
1:00 PM |
9' Pickup Material Spreaders Tabulation Sheet |
D210-047-RN Lease - Wheeled Excavator RFB and Addendum 001 |
February 1, 2010 |
1:00 PM |
Lease - Wheeled Excavator Tabulation Sheet |
| D210-051-R2 Hauling Cinders RFB |
January 27, 2010 |
1:00 PM |
Hauling Cinders Tabulation Sheet |
| D210-050-R2 Carpentry and Plumbing Supplies RFQ |
January 22, 2010 |
1:00 PM |
Carpentry and Plumbing Tabulation Sheet |
D210-044-RN Filters (Air, Fuel, Oil, Etc.) RFB and 2010 Filter Pricing Sheet and Addendum 001 - Informational Only and MoDOT D2 Equipment Counts |
January 20, 2010 |
1:00 PM |
Filters (Air, Oil, Fuel, etc.) Tabulation Sheet |
| D210-046-R2 Spill Containment Pallets RFQ |
January 12, 2009 |
1:00 PM |
Spill Containment Pallets Tabulation Sheet |
| D210-040-RN Undercarriage For Bulldozer RFB and Addendum 001 and Addendum 002 |
December 23, 2009
December 29, 2009 |
1:00 PM |
Undercarriage for Bulldozer Tabulation Sheet |
| D210-039-R2 Elliptical Leg Tank RFQ |
December 16, 2009 |
1:00 PM |
Elliptical Leg Tank Tabulation Sheet |
| D210-042-R2 Various Aggregates RFQ |
December 16, 2009 |
10:00 AM |
Various Aggregates Tabulation Sheet |
| D210-043-R2 Trackhoe With Operator RFQ |
December 16, 2009 |
9:00 AM |
RFQ NOT AWARDED - Trackhoe With Operator Tabulation Sheet |
| D210-038-R2 Haydite VS. Trap Rock RFB |
December 15, 2009 |
1:00 PM |
Haydite VS. Trap Rock Tabulation Sheet |
| D210-041-R2 Plant Pick-Up Rip-Rap RFQ |
December 15, 2009 |
10:00 AM |
Plant Pick-Up Rip-Rap Tabulation Sheet |
| D210-037-RN Pressure Washers RFQ |
December 11, 2009 |
1:00 PM |
Pressure Washer Tabulation Sheet |
| D210-033-R2 Diamond Saw Blades RFQ |
December 11, 2009 |
1:00 PM |
Diamond Saw Blades Tabulation Sheet |
| D210-032-R2 Rip-Rap RFB |
December 10, 2009 |
1:00 PM |
Rip-Rap Tabulation Sheet |
| D210-031-R2 Type S Poly Culvert Pipe RFQ |
December 9, 2009 |
1:00 PM |
Type S Poly Culvert Pipe Tabulation Sheet |
| D210-030-R2 Culvert Pipe Liner RFQ |
December 8, 2009 |
1:00 PM |
Culvert Pipe Liner Tabulation Sheet |
| D210-029-R2 Type 2 Rock Blanket RFQ |
December 7, 2009 |
1:00 PM |
Type 2 Rock Blanket Tabulation Sheet |
| D210-034-R2 On-Call Hauling Service RFQ |
December 3, 2009 |
1:00 PM |
On-Call Hauling Service Tabulation Sheet |
| D210-027-RM Solar Flashing Amber Beacon RFQ |
November 12, 2009 |
1:00 PM |
Solar Flashing Amber Beacon Tabulation Sheet |
D210-008-RM Tree Removal Services RFB and Addendum 001 |
November 10, 2009 |
1:00 PM |
Tree Removal Services Tabulation Sheet |
D210-026-RN Motorgrader Tires RFB and Addendum 001 |
October 28, 2009 |
1:00 PM |
Motorgrader Tires Tabulation Sheet |
| D210-025-RO Used Oil Disposal RFB |
October 23, 2009 |
1:00 PM |
Used Oil Disposal Tabulation Letter |
| D210-023-R2 Underground Boring RFB |
October 16, 2009 |
1:00 PM |
Underground Boring Tabulation Sheet |
D210-017-RO Janitorial Services RFB and Building Floor Plans and Addendum 001 |
October 6, 2009 |
1:00 PM |
Janitorial Services Tabulation Sheet |
D210-018-RM One-Month Trackhoe Lease RFQ and 902 North Missouri Street (Map) |
September 21, 2009 |
1:00 PM |
One-Month Trackhoe Lease Tabulation Sheet |
| D210-022-R2 Type 2 Rock Blanket RFQ |
September 18, 2009 |
1:00 PM |
Type 2 Rock Blanket Tabulation Sheet |
| D210-021-R2 Metal Pipe RFQ |
September 17, 2009 |
1:00 PM |
Metal Pipe Tabulation Sheet |
| D210-016-RN Shoulder Recycler RFQ |
September 17, 2009 |
1:00 PM |
Shoulder Recycler Tabulation Sheet |
D210-020-R2 Steel Piling RFQ
and Addendum 001 |
September 16, 2009 |
1:00 PM |
Steel Piling Tabulation Sheet |
| D210-015-R2 Dozer Rental RFQ |
August 24, 2009 |
1:00 PM |
Dozer Rental Tabulation Sheet |
| D210-014-R2 Trailers RFQ |
August 21, 2009 |
1:00 PM |
Trailers RFQ Tabulation Sheet |
| D210-013-R2 Hauling Cinders RFB |
August 20, 2009 |
1:00 PM |
Hauling Cinders Tabulation Sheet |
D210-005-RM Guardrail Repair Randolph County RFB and General Wage Order and Map of Randolph Co. Guardrail Projects and Plan Sheet - Proposed Guardrail at the Norfolk and Southern Railroad Overpass and Plan Sheet - Proposed Guardrail at McKinsey St. Overpass and Missouri Standard Specification for Highway Construction 2004 Edition and Typical Work Zone Applicaitons |
August 20, 2009 |
1:00 PM |
Guardrail Repair Randolph County Tabulation Sheet |
| D210-012-R2 Aluminum Box Culvert RFQ and Addendum 001 |
August 19, 2009 |
1:00 PM |
Aluminum Box Culvert Tabulation Sheet |
| D210-011-R2 Coal Slag Abrasive RFQ |
August 18, 2009 |
1:00 PM |
Coal Slag Abrasive Tabulation Sheet |
| D210-007-R2 Dust Control RFQ |
August 10, 2009 |
1:00 PM |
Dust Control Tabulation Sheet |
| D210-006-R2 Spec 8 Aggregate RFQ |
August 7, 2009 |
1:00 PM |
Spec 8 Aggregate Tabulation Sheet |
D210-004-RM Concrete Pad RFQ
and Addendum 001 |
August 3, 2009 |
1:00 PM |
Concrete Pad Tabulation Sheet |
| D210-002-R2 Arched Metal Pipe RFQ and Addendum 001 |
July 17, 2009 |
1:00 PM |
Arched Metal Pipe Tabulation Sheet |
| D210-001-R2 Metal Pipe RFQ |
July 16, 2009 |
1:00 PM |
RFQ CANCELLED (NOT AWARDED) |
| D209-097-R2 Rip-Rap RFB |
July 15, 2009 |
1:00 PM |
Rip-Rap Tabulation Sheet |
D209-100-RM Electrical Components RFQ and Addendum 001 |
July 8, 2009 |
1:00 PM |
Electrical Components Tabulation Sheet |
| D209-096-R2 Poly Pipe RFB |
July 8, 2009 |
1:00 PM |
Poly Pipe Tabulation Sheet |
| D209-095-R2 Metal Pipe RFB |
July 7, 2009 |
1:00 PM |
Metal Pipe Tabulation Sheet |
| D209-094-R2 Western Snowplows RFQ |
July 6, 2009 |
1:00 PM |
Western Snowplows Tabulation Sheet |
| D209-093-R2 Bush Hog 2715 Cutter RFQ |
July 2, 2009 |
2:00 PM |
Bush Hog 2715 Cutter Tabulation Sheet |
| D209-092-R2 Pipe Liner RFQ |
July 1, 2009 |
1:00 PM |
Pipe Liner Tabulation Sheet |
| D209-099-R2 Plate Arch Pipe RFQ and Addendum 001 |
July 1, 2009 |
10:00 AM |
RFQ CANCELLED (NOT AWARDED) |
| D209-091-R2 Tire Chains RFQ |
June 30, 2009 |
1:00 PM |
Tire Chains Tabulation Sheet |
| D209-090-R2 Flexible Delineators RFQ |
June 29, 2009 |
1:00 PM |
Flexible Delineators Tabulation Sheet |
| D209-089-R2 18-Foot Trailer RFQ |
June 29, 2009 |
10:00 AM |
18-Foot Trailer Tabulation Sheet |
| D209-087-RM Loader Tires RFQ |
June 8, 2009 |
10:00 AM |
Loader Tire Tabulation Sheet |
| D209-086-R2 Walk-Behind Mower RFQ |
June 4, 2009 |
1:00 PM |
Walk-Behind Mower Tabulation Sheet |
| D209-085-R2 Corrugated Metal Pipe RFQ |
June 3, 2009 |
10:00 AM |
Corrugated Metal Pipe Tabulation Sheet |
D209-084-R2 Digitizing Microfiche RFQ and Addendum 001 |
May 28, 2009 |
1:00 PM |
Digitizing Microfiche Tabulation Sheet |
| D209-083-RM 2009-2010 Annual Propane RFB |
May 28, 2009 |
1:00 PM |
2009-2010 Annual Propane Tabulation Sheet |
| D209-081-RM Retaining Wall Knob Style Concrete Interlocking Blocks RFQ |
May 18, 2009 |
1:00 PM |
Retaining Wall Knob Style Concrete Interlocking Blocks Tabulation Sheet |
| D209-054-RM Hot Water Pressure Washer RFQ |
May 4, 2009 |
1:00 PM |
Hot Water Pressure Washer Tabulation Sheet |
| D209-080-RM Concrete Slab Unionville Salt Bldg. RFQ |
April 30, 2009 |
1:00 PM |
Concrete Slab Tabulation Sheet |
D209-074-RM Courier Service RFB and Addendum 001 |
April 15, 2009
April 21, 2009 |
1:00 PM |
NO AWARD - Utilized In-house Services
Courier Service Tabulation Sheet |
| D209-079-R2 Plywood and Lumber RFQ |
April 17, 2009 |
1:00 PM |
Plywood and Lumber Tabulation Sheet |
| D209-078-R2 Culvert Pipe Liner RFQ |
April 16, 2009 |
1:00 PM |
Culvert Pipe Liner Tabulation Sheet |
| D209-077-R2 Corrugated Metal Pipe RFQ |
April 15, 2009 |
1:00 PM |
Corrugated Metal Pipe Tabulation Sheet |
| D209-076-R2 Steel RFQ |
April 14, 2009 |
10:00 AM |
Steel Tabulation Sheet |
| D209-067-RN Chassis Removal and Installation RFQ |
April 8, 2009 |
1:00 PM |
Chassis Removal and Installation Tabulation Sheet |
| D209-075-R2 Grade E Concrete Rock and Concrete Sand RFQ |
March 30, 2009 |
1:00 PM |
Grade E Concrete Rock and Concrete Sand Tabulation Sheet |
| D209-073-RM Annual Hot Mix RFB |
March 25, 2009 |
1:00 PM |
Annual Hot Mix Price Agreements |
| D209-059-RM Fuel Pump Dispensers RFB |
March 16, 2009 |
1:00 PM |
Fuel Pump Dispensers Tabulation Sheet |
D209-072-R2 Crushed Porphyry Rock RFB
and Addendum 001 |
March 13, 2009 |
10:00 AM |
Crushed Porphyry Rock Tabulation Sheet |
| D209-066-RN Motorgrader Shoulder Conditioning Attachment RFQ |
March 12, 2009 |
1:00 PM |
Motorgrader Shoulder Conditioning Attachment Tabulation Sheet |
| D209-071-R2 Truck Conspicuity D.O.T. Tape RFQ |
March 12, 2009 |
10:00 AM |
Truck Conspicuity D.O.T. Tape Tabulation Sheet |
| D209-070-R2 Bush Hog 2715 Cutter RFQ |
March 11, 2009 |
2:00 PM |
NOT AWARDED due to budget constraints
Bush Hog 2715 Cutter Tabulation Sheet |
| D209-069-R2 Pull Broom RFQ |
March 11, 2009 |
12:00 PM (Noon) |
Pull Broom Tabulation Sheet |
| D209-068-R2 Steel RFQ |
March 10, 2009 |
1:00 PM |
Steel Tabulation Sheet |
| D209-064-R2 Plate Steel RFQ |
March 10, 2009 |
10:00 AM |
Plate Steel Tabulation Sheet |
D209-065-R2 Hauling Cinders RFQ
|
March 4, 2009 |
1:00 PM |
Hauling Cinders Tabulation Sheet |
D209-062-R2 Contract Mowing RFQ
|
February 24, 2009 |
1:00 PM |
Contract Mowing Tabulation Sheet |
| D209-063-R2 Corrugated Metal Pipe RFQ |
February 18, 2009 |
1:00 PM |
Corrugated Metal Pipe Tabulation Sheet |
| D209-053-RE Annual Concrete RFB |
February 17, 2009 |
1:00 PM |
Annual Concrete Tabulation Sheet |
| D209-061-R2 Corrugated Metal Pipe RFQ |
February 11, 2009 |
1:00 PM |
Corrugated Metal Pipe Tabulation Sheet |
| D209-058-R2 Type 2 Rock Blanket RFQ |
January 30, 2009 |
1:00 PM |
Type 2 Rock Blanket Tabulation Sheet |
| D209-082-R2 Uretek Pavement Leveling SFS Posting |
May 12, 2009 |
1:00 PM |
Uretek USA, Inc. |
| D209-060-R2 Video Detection System Parts RFQ |
February 5, 2009 |
1:00 PM |
Delta Technologies, Inc.
Video Detection System Parts Tabulation Sheet |
D209-047-RM One-Month Lease Trackhoe RFQ
and Addendum 001
|
January 29, 2009 |
1:00 PM |
One-Month Lease Trackhoe Tabulation Sheet |
D209-050-R2 Type 2 Rock Blanket RFB and Addendum 001
|
January 7, 2009
January 5, 2009 |
1:00 PM |
Type 2 Rock Blanket Tabulation Sheet |
| D209-052-R2 Aggregates - Sand RFQ |
January 2, 2009 |
1:00 PM |
Aggregates - Sand Tabulation Sheet |
| D209-049-R2 Corrugated Metal Pipe RFQ |
December 17, 2008 |
1:00 PM |
Corrugated Metal Pipe Tabulation Sheet |
| D209-044-R2 Crushed Porphyry Rock RFB |
December 16, 2008 |
1:00 PM |
Crushed Porphyry Rock Tabulation Sheet |
| D209-048-R2 4X4 Utility Vehicle RFQ |
December 15, 2008 |
1:00 PM |
4X4 Utility Vehicle Tabulation Sheet |
| D209-043-R2 Aggregates - Shot Rock RFB |
December 12, 2008 |
1:00 PM |
Aggregates - Shot Rock Tabulation Sheet |
D209-042-R2 Aggregates - Rip-Rap RFB and
Addendum 001 |
December 11, 2008 |
1:00 PM |
Aggregates - Rip-Rap Tabulation Sheet |
| D209-035-RE Repair Fencing RFQ |
December 11, 2008 |
1:00 PM |
Repair Fencing Tabulation Sheet |
| D209-046-R2 Aggregates - 1.5 Inch Rock RFQ |
December 9, 2008 |
1:00 PM |
Aggregates - 1.5 Inch Rock Tabulation Sheet |
| D209-041-R2 Diamond Saw Blades RFQ |
December 8, 2008 |
1:00 PM |
Diamond Saw Blades Tabulation Sheet |
| D209-045-R2 Corrugated Metal Pipe RFQ |
December 5, 2008 |
1:00 PM |
Corrugated Metal Pipe Tabulation Sheet |
| D209-039-R2 Lockout Tagout Kits RFQ |
December 2, 2008 |
1:00 PM |
Lockout Tagout Kits Tabulation Sheet |
| D209-040-R2 Protect-a-Rail and Mounting Kit RFQ |
November 26, 2008 |
1:00 PM |
Protect-a-Rail and Mounting Kit Tabulation Sheet |
| D209-038-R2 Corrugated Metal Pipe RFQ |
November 26, 2008 |
1:00 PM |
Corrugated Metal Pipe Tabulation Sheet |
| D209-037-R2 Type S Poly Culvert Pipe RFQ |
November 25, 2008 |
1:00 PM |
Type S Poly Culvert Pipe Tabulation Sheet |
D209-030-R2 Crushed Porphyry Rock RFB and
Addendum 001 |
November 20, 2008 |
1:00 PM |
Crushed Porphyry Rock Tabulation Sheet |
| D209-031-R2 Coal Slag Abrasive RFQ |
November 18, 2008 |
1:00 PM |
Coal Slag Abrasive Tabulation Sheet |
| SFS 7 - D209-028-RM Screened, Washed & Cleaned Cinders |
November 17, 2008 |
1:00 PM |
Reed Minerals, Inc. - Screened Washed and Cleaned Cinders Tabulation Sheet |
| D209-029-RM Loader Tires RFQ |
November 10, 2008 |
1:00 PM |
Loader Tire Tabulation Sheet |
| D209-025-R2 On-Call Hauling Service RFQ |
October 30, 2008 |
1:00 PM |
On-Call Hauling Service Tabulation Sheet
Haul Rate Chart:
1) Haul Rate Chart - Effective 11-01-08
2) Haul Rate Chart - Effective 12-01-08
3) Haul Rate Chart - Effective 02-01-09
4) Haul Rate Chart - Effective 03-01-09 |
| D209-015-RM ProLaser III Laser Radar Gun RFQ |
October 29, 2008 |
1:00 PM |
ProLaser III Laser Radar Gun Tabulation Sheet |
D209-024-R2 Recap Tire Program RFB
and Addendum 001
|
October 28, 2008 |
1:00 PM |
Recap Tire Program Tabulation Sheet |
| D209-027-RM Knob Style Interlocking Concrete Blocks RFQ |
October 16, 2008 |
2:00 PM |
Knob Style Interlocking Concrete Blocks Tabulation Sheet |
| D209-026-RM Video Detection Equipment RFB |
October 9, 2008 |
1:00 PM |
Video Detection Equipment Tabulation Sheet |
| D209-023-RE Light Strips and Bulbs RFB |
October 8, 2008 |
1:00 PM |
Light Strips and Bulbs Tabulation Sheet |
| D209-022-R2 Flexible Delineators RFQ |
October 3, 2008 |
1:00 PM |
Flexible Delineators Tabulation Sheet |
| D209-021-R2 Plate Steel and Pipe RFQ |
October 1, 2008 |
1:00 PM |
Plate Steel and Pipe Tabulation Sheet |
| D209-020-R2 Used Oil Disposal RFB |
September 29, 2008 |
1:00 PM |
Used Oil Disposal Tabulation Letter |
| D209-019-R2 Culvert Pipe Liner RFQ |
September 25, 2008 |
1:00 PM |
Culvert Pipe Liner Tabulation Sheet |
| D209-018-R2 Type S Poly Culvert Pipe RFB |
September 23, 2008 |
1:00 PM |
Type S Poly Culvert Pipe Tabulation Sheet |
| D209-014-R2 GPS Survey Equipment RFB |
September 18, 2008 |
1:00 PM |
GPS Survey Equipment Tabulation Sheet |
| D209-017-R2 Type 2 Rock Blanket RFQ |
September 15, 2008 |
1:00 PM |
Type 2 Rock Blanket Tabulation Sheet |
| D209-008-RE Crane and Pile Hammer RFB |
September 10, 2008 |
1:00 PM |
Crane and Pile Hammer Tabulation Sheet |
| D209-012-R2 Premium Hardwood Mulch RFQ |
August 29, 2008 |
1:00 PM |
Premium Hardwood Mulch Tabulation Sheet |
| D209-013-RM One-Month Lease Trackhoe RFQ |
August 28, 2008 |
1:00 PM |
One-Month Lease Trackhoe Tabulation Sheet |
| D209-011-R2 Western Snowplow RFQ |
August 26, 2008 |
1:00 PM |
Western Snowplow Tabulation Sheet |
| D209-010-R2 Type 2 Rock Blanket RFQ |
August 19, 2008 |
1:00 PM |
Type 2 Rock Blanket Tabulation Sheet |
D209-007-RE Bridge Repair RFQ Attachments:
|
August 7, 2008 |
1:00 PM |
Bridge Repair Tabulation Sheet |
| D209-006-R2 Tire Chains and Crosslinks RFQ |
August 6, 2008 |
1:00 PM |
Tire Chains and Crosslinks Tabulation Sheet |
| D209-005-R2 Waste Aggregate Scalpings RFQ |
August 5, 2008 |
1:00 PM |
Waste Aggregate Scalpings Tabulation Sheet |
| D209-003-RN Whelen LED Lights SFS |
July 21. 2008 |
1:00 PM |
Whelen Engineering Co.
Whelen LED Lights Tabulation Sheet |
D208-057-RE Fuel Tank Installation RFB
and Addendum 001
|
July 10, 2008 |
1:00 PM |
Fuel Tank Installation Tabulation Sheet |
| D209-002-R2 Aggregates - Rip-Rap RFQ |
July 9, 2008 |
10:00 AM |
Aggregates - Rip-Rap Tabulation Sheet |
| D208-055-RE Fayette Force Main RFB |
July 3, 2008 |
1:00 PM |
Fayette Force Main Tabulation Sheet |
| D208-058-R2 Oils, Lubricants & Fluids RFQ |
July 1, 2008 |
1:00 PM |
Initial Award Sheet:
Oils, Lubricants & Fluids Tabulation Sheet
Revised Award Sheets:
1) Pricing Sheet - Effective 08-01-08
2) Pricing Sheet - Effective 10-01-08
3) Pricing Sheet - Effective 11-01-08
4) Pricing Sheet - Effective 12-01-08 |
D208-050-RE Fuel Tank Removal RFQ and Addendum 001
|
June 4, 2008
June 12, 2008
|
1:00 PM |
Fuel Tank Removal Tabulation Sheet |
D208-054-R2 Contract Mowing RFQ and Addendum 001 - Informational Only
|
June 11, 2008 |
1:00 PM |
Contract Mowing Tabulation Sheet |
D208-051-RE Fuel Tank Installation RFB and
Addendum 001
|
May 29, 2008
June 5, 2008
|
1:00 PM |
RFB CANCELLED (NOT AWARDED) |
D208-052-RN 36 Inch Steel Pipe RFQ
|
June 3, 2008
|
1:00 PM |
36 Inch Steel Pipe Tabulation Sheet |
| D208-059-R2 Video Detection Equipment SFS RFQ |
June 18, 2008 |
1:00 PM |
Delta Technologies, Inc. - Video Detection Equipment Tabulation Sheet |
| D208-056-RN Portable Tank Cleaning Unit SFS RFQ |
June 10, 2008 |
1:00 PM |
RCI Technologies - Portable Tank Cleaning Unit Tabulation Sheet |
| D208-046-RE Annual Propane RFB |
May 29, 2008 |
1:00 PM |
Annual Propane Tabulation Sheet |
| D208-053-R2 Materials Lab Equipment SFS RFQ |
May 28, 2008 |
1:00 PM |
Gilson Company, Inc. - Materials Lab Equipment Tabulation Sheet
|
| D208-048-RN Concrete Screed SFS RFQ |
May 23, 2008 |
1:00 PM |
Lura Enterprises, LLC. -
Concrete Screed Tabulation Sheet |
| D208-049-RE Kirksville Project Office Addition RFQ |
May 20, 2008 |
1:00 PM |
Kirksville Project Office Addition Tabulation Sheet |
| D208-047-RE Heavy Duty 10 Foot Rear Mount Blade RFQ |
May 7, 2008 |
1:00 PM |
Heavy Duty 10 Foot Rear Mount Blade Tabulation Sheet |
| D208-044-RE Annual Hot Mix RFB |
April 15, 2008 |
1:00 PM |
Annual Hot Mix Tabulation Sheet |
| D208-042-RE 2nd Quarter Oil Lube and Fluids RFQ |
April 4, 2008 |
1:00 PM |
2nd Quarter Oil Lube and Fluids Tabulation Sheet |
| D208-043-R2 Plant Pick Up Sand SFS RFQ |
March 31, 2008 |
1:00 PM |
Missouri Contractors, LLC. -
Plant Pick Up Sand Tabulation Sheet |
D208-040-RE Fabric Door RFB and Addendum 001
|
March 20, 2008 |
1:00 PM |
Fabric Door Tabulation Sheet |
| D208-039-R2 Grade E Concrete Rock and Concrete Sand RFQ |
March 6, 2008 |
1:00 PM |
Grade E Concrete Rock and Concrete Sand Tabulation Sheet |
D208-038-R2 Poly Tanks RFQ and Poly Tank Pictures - For Example Only
|
March 4, 2008 |
1:00 PM |
Poly Tank Tabulation Sheet |
| D208-037-R2 Pull Broom RFQ |
March 3, 2008 |
1:00 PM |
Pull Broom Tabulation Sheet |
| D208-036-R2 Black Cat Joma Blades SFS RFQ |
February 27, 2008 |
1:00 PM |
Winter Equipment Co. -
Black Cat Joma Blades Tabulation Sheet |
| D208-033-RE Annual Concrete RFB |
February 14, 2008 |
1:00 PM |
Annual Concrete Tabulation Sheet |
| D208-034-R2 Wireless Interconnect SFS RFQ |
February 13, 2008 |
1:00 PM |
Brown Traffic Products -
Wireless Interconnect Tabulation Sheet |
D208-032-R2 Employee Recognition Shirts RFQ
and Addendum 001 and Addendum 002
|
January 22, 2008
January 24, 2008 |
1:00 PM |
Employee Recognition Shirts Tabulation Sheet |
| D208-029-R2 Culvert Pipe Liner RFQ |
January 16, 2008 |
1:00 PM |
Culvert Pipe Liner Tabulation Sheet |
| D208-028-R2 Type S Poly Culvert Pipe RFB |
January 15, 2008 |
1:00 PM |
Type S Poly Culvert Pipe Tabulation Sheet |
D208-027-R2 Diamond Saw Blades RFQ
and Addendum 001 - Informational Only
|
January 10, 2008 |
1:00 PM |
Diamond Saw Blades Tabulation Sheet |
D208-026-R2 Aggregates - 1 Inch Driveway Rock - RFQ and Addendum 001 and Addendum 002
|
January 9, 2008 |
1:00 PM |
Aggregates - 1 Inch Driveway Rock - Tabulation Sheet |
D208-025-R2 Aggregates - Rip-Rap - RFB
and Addendum 001
|
January 8, 2008 |
1:00 PM |
Aggregates - Rip-Rap - Tabulation Sheet |
D208-031-RE 1st Quarter Oil Lube and Fluids RFQ and Addendum 001
|
December 27, 2007
January 2, 2008 |
1:00 PM |
1st Quarter Oil Lube and Fluids Tabulation Sheet (Vendor withdrew their quote) 1st Quarter Oil Lube and Fluids Tabulation Sheet - Revised 02-04-08
|
| D208-030-R2 Video System SFS RFQ |
January 17, 2008 |
1:00 PM |
Enforcement Video, LP
(DBA: WatchGuard Video) -
Video System SFS Tabulation Sheet |
| D208-024-R2 Haydite - Fine Grade - SFS RFB |
January 3, 2008 |
1:00 PM |
Buildex, Inc. -
Haydite - Fine Grade - SFS Tabulation Sheet |
| D208-003-R2 Floor Mat and Shop Towel Service RFQ |
December 20, 2007 |
1:00 PM |
Floor Mat and Shop Towel Service Tabulation Sheet |
| D208-022-RN Geomelt RFQ |
November 14, 2007 |
1:00 PM |
Smith Fertilizer & Grain, Inc. |
| D208-017-RN Motorgrader Shouldering Tool RFQ |
October 29, 2007 |
1:00 PM |
Motorgrader Shouldering Tool Tabulation Sheet |
| D208-020-R2 Used Oil Disposal RFB |
October 26, 2007 |
1:00 PM |
Used Oil Disposal Tabulation Letter |
| D208-015-R2 4th Quarter Oil Lube and Fluids RFQ |
October 2, 2007 |
1:00 PM |
Oil Lube and Fluids Tabulation Sheet |
D208-014-R2 Rally Towels RFQ and Addendum 001
|
October 1, 2007 |
1:00 PM |
Rally Towels Tabulation Sheet |
D208-012-RN Diesel Tank Cleaning RFB and
Addendum 001 |
September 18, 2007 |
1:00 PM |
Diesel Tank Tabulation Sheet |
| D208-013-R2 Poly Pipe RFQ |
September 11, 2007 |
1:00 PM |
Poly Pipe Tabulation Sheet |
| D208-006-RE Fabric Doors RFB (Cancelled) |
August 30, 2007 |
1:00 PM |
RFB CANCELLED (NOT AWARDED) |
| D208-010-RE Paint Tank Cleaning RFQ |
August 28, 2007 |
1:00 PM |
Paint Tank Cleaning Tabulation Sheet |
| D208-009-RN Material Spreaders RFQ |
August 22, 2007 |
1:00 PM |
Spreader RFB Tabulation Sheet |
| D208-011-R2 Child Car Seats RFQ |
August 21, 2007 |
1:00 PM |
Child Car Seats Tabulation Sheet |
| D208-008-R2 Aluminum Backing Bars RFQ (Cancelled) |
August 9, 2007 |
1:00 PM |
RFQ CANCELLED (NOT AWARDED) |
| D208-007-R2 Posts - Slip Bases RFQ |
August 8, 2007 |
1:00 PM |
Posts - Slip Bases Tabulation Sheet |
D208-004-R2 Pavement Leveling RFB
and General Wage Order No. 50 and D208-004-R2 Addendum 001
|
August 3, 2007 |
1:00 PM |
Pavement Leveling Tabulation Sheet |
| D208-002-R2 Transportation Options RFI (Request For Information Only) |
July 6, 2007 |
1:00 PM |
The following were the responses received to the RFI:
RFI Response - Hornblower Marine Services
RFI Response - OATS Inc
RFI Response - Sunset Tours Inc
RFI Response - White Knight Coaches Inc |
| D208-001-RN Pressure Washer RFQ |
June 27, 2007 |
1:00 PM |
Pressure Washer Tabulation Sheet |
| D207-082-R2 Aggregates - Rip-Rap - RFQ |
June 21, 2007 |
1:00 PM |
Aggregates - Rip-Rap - Tabulation Sheet |
| D207-081-R2 Trackhoe With Operator RFQ |
June 15, 2007 |
1:00 PM |
RFQ CANCELLED (NOT AWARDED ) |
D207-052-RN Lease Trackhoe RFB and Addendum 001
|
June 14, 2007 |
1:00 PM |
Lease Trackhoe Bid Tabulation Sheet |
D207-078-R2 Contract Mowing - Saline County - RFQ and D207-078-R2 Addendum 001
|
June 6, 2007 |
1:00 PM |
Contract Mowing - Saline County - Tabulation Sheet |
| D207-073-RE Annual Propane RFB |
May 30, 2007 |
1:00 PM |
Annual Propane Tabulation Sheet |
| D207-076-R2 Haydite - Fine Grade - SFS RFB |
May 18, 2007 |
1:00 PM |
Buildex, Inc. - Haydite SFS Tabulation Sheet |
| D207-075-RN Walk-Behind Mower RFQ |
May 15, 2007 |
1:00 PM |
Walk-Behind Mower Tabulation Sheet |
D207-072-RE Refurbish and Repair Salt Buildings RFQ and Addendum 001 and Addendum 002
|
May 9, 2007 |
1:00 PM |
Refurbish and Repair Salt Buildings Tabulation Sheet |
| D207-070-RN Leased Aggregate Screen RFQ |
May 9, 2007 |
1:00 PM |
Leased Aggregate Screen Tabulation Sheet |
| D207-074-R2 Child Car Seats RFQ |
May 3, 2007 |
1:00 PM |
Child Car Seats Tabulation Sheet |
| D207-071-RN Zero-Turn Radius Mower RFQ |
May 3, 2007 |
1:00 PM |
Zero-Turn Radius Mower Tabulation Sheet |
| D207-069-R2 Flowable Backfill RFQ |
April 30, 2007 |
1:00 PM |
Flowable Backfill Tabulation Sheet |
| D207-067-R2 Topcon GPS Survey Equipment RFB |
April 24, 2007 |
1:00 PM |
Topcon GPS Survey Equipment Tabulation Sheet |
D207-065-RE Milan Furnace RFQ and Addendum 001
|
April 24, 2007 |
1:00 PM |
Milan Furnace Tabulation Sheet |
| D207-064-RE Oil Separator for Princeton and Keytesville RFQ |
April 19, 2007 |
1:00 PM |
Oil Separator for Princeton and Keytesville Tabulation Sheet |
D207-062-RE Seal Coating - D2 HQ Complex - RFQ and Addendum 001
|
April 17, 2007 |
1:00 PM |
Seal Coating - D2 HQ Complex - Tabulation Sheet |
| D207-057-RE Annual Hot Mix RFB |
April 19, 2007 |
1:00 PM |
Annual Hot Mix Tabulation Sheet |
D207-058-R2 Corrugated Metal Pipe RFB
and D207-058-R2 Addendum 001
|
April 11, 2007 |
1:00 PM |
Corrugated Metal Pipe Tabulation Sheet |
| D207-055-RN Mobile Lab RFQ |
April 10, 2007 |
1:00 PM |
Mobile Lab RFQ Tabulation Sheet |
D207-061-R2 Haydite - Grade B - SFS RFB
SFS RFB Cancelled (Not Awarded)
|
April 3, 2007 |
1:00 PM |
Buildex, Inc.
Product not available in the required timeframe
|
| D207-060-R2 Tire Chains and Cross Links RFQ |
April 3, 2007 |
1:00 PM |
Tire Chains and Cross Links Tabulation Sheet |
| D207-059-R2 Grade E Concrete Rock and Concrete Sand RFQ |
April 2, 2007 |
1:00 PM |
Grade E Concrete Rock and Concrete Sand Tabulation Sheet |
D207-056-RE 2nd and 3rd Quarter Oil Lube and Fluids and Addendum 001
|
March 29, 2007 |
1:00 PM |
2nd and 3rd Quarter Oil Lube and Fluids Tabulation Sheet |
| D207-053-RN Walk-Behind Mower RFQ |
March 29, 2007 |
1:00 PM |
Walk-Behind Mower Tabulation Sheet |
| D207-051-RN Guardrail RFQ |
March 28, 2007 |
1:00 PM |
Guardrail RFQ Tabulation Sheet |
| D207-050-RN Lumber RFQ |
March 22, 2007 |
1:00 PM |
Lumber RFQ Tabulation Sheet |
| D207-049-R2 Arrive Alive T-Shirts RFQ |
March 6, 2007 |
1:00 PM |
Arrive Alive T-Shirts Tabulation Sheet |
| D207-048-R2 Promotional Items RFQ |
March 1, 2007 |
1:00 PM |
Promotional Items Tabulation Sheet |
| D207-022-RN Weed Control Matting RFQ |
February 8, 2007 |
1:00 PM |
Weed Control Matting Tabulation Sheet |
| D207-046-RN Pull Broom RFQ |
February 22, 2007 |
1:00 PM |
Pull Broom Tabulation Sheet |
D207-045-RN Guardrail Repairs RFQ - Randolph County Prevailing Wage Information General Wage Order No. 50
|
February 14, 2007 |
1:00 PM |
Guardrail Repairs Tabulation Sheet - Randolph County |
D207-044-RN Guardrail Repairs RFQ - Macon County Prevailing Wage Information General Wage Order No. 50
|
February 14, 2007 |
1:00 PM |
Guardrail Repairs Tabulation Sheet - Macon County |
| D207-042-RN Surplus Asphalt Millings RFB |
February 21, 2007 |
1:00 PM |
Surplus Asphalt Millings Tabulation Sheet |
| D207-041-RE Annual Concrete RFB |
February 15, 2007 |
1:00 PM |
D207-041-RE Annual Concrete Tabulation Sheet |
| D207-039-RN Lease Roller RFB |
February 15, 2007 |
1:00 PM |
Lease Roller Bid Tabulation Sheet |
| D207-035-RE Grease and Oil Trap Tank RFQ |
January 31, 2007 |
1:00 PM |
D207-035-RE Grease and Oil Trap Tank Tabulation Sheet |
D207-034-RE 2 Inch Back Flow Preventor RFQ |
January 30, 2007 |
1:00 PM |
RFQ CANCELLED
(NOT AWARDED) |
| D207-020-RN Truck Body RFQ |
January 25, 2007 |
1:00 PM |
Truck Body RFQ Tabulation Sheet |
| D207-038-R2 Iron Mountain Chips - Trap Rock RFQ |
January 24, 2007 |
1:00 PM |
Iron Mountain Chips - Trap Rock Tabulation Sheet |
D207-030-RE Fabric Door RFB and D207-030-RE Addendum 001
|
January 9, 2007 |
1:00 PM |
D207-030-RE Fabric Door Tabulation Sheet |
| D207-037-RN Gabion Stone RFQ |
January 18, 2007 |
1:00 PM |
Gabion Stone Tabulation Sheet |
| D207-019-R2 Culvert Pipe Liner RFB |
January 17, 2007 |
1:00 PM |
Culvert Pipe Liner Tabulation Sheet |
| D207-032-RN PVC Coated Gabion Baskets RFQ |
January 12, 2007 |
1:00 PM |
Gabion Baskets Tabulation Sheet |
| D207-033-RE 1st Qtr Oil Lube and Fluids |
December 28, 2006 |
1:00 PM |
Oil Lube and Fluids Tabulation Sheet |
| D207-031-RE Replacing Existing Car Wash Equipment RFB |
December 28, 2006 |
1:00 PM |
Replacing Existing Car Wash Equipment Tabulation Sheet |
| D207-029-RE Atlanta Overhead Door Installation RFQ |
December 14, 2006 |
1:00 PM |
Atlanta Overhead Door Installation Tabulation Sheet |
| D207-027-RN Polyethylene Tank RFQ |
November 30, 2006 |
1:00 PM |
Polyethylene Tank Tabulation Sheet |
| D207-028-RE Furnace for Kirksville Truck Wash Bay RFQ |
November 29, 2006 |
1:00 PM |
Furnace for Kirksville Truck Wash Bay Tabulation Sheet |
| D207-026-R2 Child Car and Booster Seats RFQ |
November 20, 2006 |
1:00 PM |
Child Car and Booster Seats Tabulation Sheet |
| D207-024-R2 Arrive Alive T-Shirts RFQ |
November 14, 2006 |
1:00 PM |
Arrive Alive T-Shirts Tabulation Sheet |
| D207-023-RE Concrete Forms for Atlanta Bosworth and New Cambria RFQ |
November 13, 2006 |
1:00 PM |
Concrete Walls for Atlanta Bosworth and New Cambria Tabulation Sheet |
| D207-021-RN Pull Broom RFQ |
October 31, 2006 |
1:00 PM |
Pull Broom Tabulation Sheet |
| D207-018-R2 Type S Poly Culvert Pipe RFB |
October 24, 2006 |
1:00 PM |
Type S Poly Culvert Pipe Tabulation Sheet |
| D207-015-RN Riding Lawn Mower RFB |
October 24, 2006 |
1:00 PM |
Riding Lawn Mower Bid Tabulation Sheet |
| D207-017-RO Used Oil Disposal RFB |
October 19, 2006 |
1:00 PM |
Used Oil Disposal Tabulation Letter |
| D207-016-RO Tree Removal - Sullivan County - RFQ |
October 18, 2006 |
1:00 PM |
Tree Removal Tabulation Sheet |
D207-012-RN Guardrail Repair RFQ and General Wage Order No. 50
|
October 10, 2006 |
1:00 PM |
Guardrail Repair Tabulation Sheet |
D207-008-RO Nine Wheel Pneumatic Roller RFB
and D207-008-RO Addendum
|
October 3, 2006 |
1:00 PM |
Nine Wheel Pneumatic Roller Tabulation Sheet |
| D207-014-RN Electric Jackhammer RFQ |
September 27, 2006 |
1:00 PM |
Electric Jackhammer Tabulation Sheet |
| D207-011-RE 4th Quarter Oil Lube Fluids RFQ |
September 27, 2006 |
1:00 PM |
4th Quarter Oil Lube Fluids Tabulation Sheet |
| D207-013-RE Concrete Piers for Liquid Storage Tanks RFQ |
September 21, 2006 |
1:00 PM |
Concrete Piers for Liquid Storage Tanks Tabulation Sheet |
| D207-010-R2 Coal Slag Sand RFQ - Rebid |
September 8, 2006 |
1:00 PM |
Coal Slag Sand Tabulation Sheet |
| D207-009-R2 Coal Slag Sand RFQ (Not awarded) |
August 31, 2006 |
1:00 PM |
RFQ NOT AWARDED
(REBID # D207-010-R2) |
| D207-007-R2 Slip Bases For Telespar Posts RFQ |
August 29, 2006 |
2:00 PM |
Slip Bases For Telespar Posts Tabulation Sheet |
D207-006-R2 Omni Anchors For Telespar Posts RFB and D207-006-R2 Addendum 001
|
August 29, 2006 |
1:30 PM |
Omni Anchors For Telespar Posts Tabulation Sheet |
| D207-005-R2 Aluminum Backing Bars RFQ |
August 29, 2006 |
1:00 PM |
Aluminum Backing Bars Tabulation Sheet |
| D207-003-RE Man Doors and Paint RFQ |
August 23, 2006 |
1:00 PM |
Man Doors and Paint Tabulation Sheet |
| D207-002-RN Front-Mount Snow Plow RFQ |
August 15, 2006 |
1:00 PM |
Snow Plow Wing Tabulation Sheet |
| D207-004-RM Cinder Coal Slag - Pick up at Plant - RFB |
August 4, 2006 |
1:00 PM |
Cinder Coal Slag Tabulation Sheet |
RFB 6-060803 D2 Janitorial Bid
RFB 6-060803 Addendum 001 |
August 3, 2006 |
1:00 PM |
RFB 6-060803 D2 Janitorial Services Tabulation |
| D206-072-RN Winter Snow Fence RFB |
July 12, 2006 |
1:00 PM |
Winter Snow Fence Tabulation Sheet |
RFB 6-060706A D02 District Uniform Bid
RFB 6-060706A Addendum 001 |
July 6, 2006 |
1:00 PM |
Contact MoDOT's Central Office Procurement Section For Information |
| D206-074-RE Tree Removal Services RFQ |
July 6, 2006 |
1:00 PM |
Tree Removal Services Tabulation Sheet |
| D206-076-RN Ice Machines RFQ |
July 17, 2006 |
1:00 PM |
Ice Machines Tabulation Sheet |
| D206-078-RN Asphalt Paver RFQ |
June 30, 2006 |
1:00 PM |
Asphalt Paver Tabulation Sheet |
| D206-075-R2 Oil Lubricants and Fluids - 3rd Qtr - RFQ |
June 27, 2006 |
1:00 PM |
Oil Lubricants and Fluids - 3rd Qtr - Tabulation Sheet |
| D206-077-R2 Spec 1 Rock - Brookfield - RFQ |
June 22, 2006 |
1:00 PM |
RFQ CANCELLED
(NOT AWARDED)
|
| D206-071-RN Walk-Behind Mower RFQ |
June 15, 2006 |
1:00 PM |
RFQ CANCELLED
(NOT AWARDED) |
| D206-070-R2 Car and Booster Seats RFQ |
June 8, 2006 |
1:00 PM |
Seats Tabulation Sheet |
| RFB 2-060524 District 2 Aggregate |
May 24, 2006 |
2:00 p.m. |
Aggregate Tabulation |
| RFB 2-060519 Plant Mix Oil Mat Material - Special |
May 19, 2006 |
10:00 a.m. |
Plant Mix - Tabulation |
| RFB D206-047-RM Wet Bottom Boiler Slag - Cinders |
May 2, 2006 |
1:00 p.m. |
2006 Wet Bottom Boiler Slag Tabulation Sheet |